NYC special and progress inspections: the TR1 list

The 21 special inspections and 4 progress inspections most often listed on facade and alteration projects, with their code references and the project phase for each.

Last checked: Oct 23, 2026

Key facts

  • TR1 Technical Report: Statement of Responsibility, filed in DOB NOW: Build
  • Who signs the RDP who identifies the inspections, the owner, and each inspection agency
  • DOB’s list about 65 special-inspection and 8 progress-inspection categories (November 2025)
  • Other reports TR2 and TR3 for concrete; TR8 for energy-code progress inspections

What is a TR1 in NYC construction?

The TR1 is the DOB Technical Report — Statement of Responsibility. It lists the special and progress inspections that apply to the project and identifies the agency or agent responsible for each. Several parties sign it: the Registered Design Professional responsible for the plans identifies the required inspections and seals that part, the owner signs to authorize each inspection agency, and each special or progress inspection agency signs and seals to take responsibility and later certifies completion. The project manager does not sign it. Energy code progress inspections are documented separately on the TR8.

The DOB technical reports

TR1 — Statement of Responsibility

Lists the applicable special and progress inspections and the agency or agent responsible for each.

TR2 — Concrete sampling and testing

Identifies the licensed concrete testing laboratory that samples and tests the concrete in the field.

TR3 — Concrete design mix

Submitted by a licensed concrete testing laboratory before the permit is issued, with the trial mixture results. The laboratory that designs the mix cannot also perform the field testing reported on the TR2.

TR8 — Energy code progress inspections

Documents the progress inspections and tests required by the NYC Energy Conservation Code.

Special inspections — BC 1705

DOB’s technical reports list (updated November 2025) has about 65 special-inspection categories. These are the 21 most often listed on facade and alteration jobs.

InspectionCodePhase
Structural Steel — WeldingBC 1705.2.1Structural steel erection
Structural Steel — High-Strength BoltingBC 1705.2.3Structural steel erection
Structural Steel — DetailsBC 1705.2.2Structural steel erection
Concrete — Cast-in-PlaceBC 1705.3Concrete structure (foundations, slabs, columns, walls)
Post-Installed AnchorsBC 1705.37Anchors in hardened concrete, masonry or stone, facade pins included
MasonryBC 1705.4Erection of structural masonry walls
Subgrade and Subsurface ConditionsBC 1705.6Excavation and foundation preparation
Deep Foundation Elements (TR5)BC 1705.7 (helical piles: 1705.9)Pile driving or drilling
Structural Stability — Alterations of Existing BuildingsBC 1705.25.1Alterations affecting the structure of an existing building
Sprayed Fire-Resistant Material (SFRM)BC 1705.14Fire protection of the structure
Mastic and Intumescent Fire-Resistant CoatingsBC 1705.15Fire protection of exposed steel
Combustible Exterior Wall CoveringsBC 1705.16Facade and building envelope
Fire-Resistant Penetrations and JointsBC 1705.17Closing of fire-rated walls and slabs (MEP rough-in and after)
Smoke Control Systems TestingBC 1705.18Smoke control commissioning
Wall Panels, Curtain Walls and VeneerBC 1705.20Facade and cladding attachment (above 40 ft)
Mechanical SystemsBC 1705.21HVAC installation
Fuel-Oil Storage and PipingBC 1705.22Installation of fuel-oil storage and piping
Tenant Protection Plan ComplianceBC 1705.26Throughout the work while dwelling units are occupied
Sprinkler SystemsBC 1705.29Sprinkler installation
Standpipe SystemsBC 1705.30Standpipe installation
Designated Seismic SystemsBC 1705.12.1Installation of seismic-designated systems

Progress inspections — BC 110

DOB lists 8 progress-inspection categories. These are the 4 most often listed on alteration jobs.

InspectionCodePhase
PreliminaryAC §28-116.2.1 / BC 110.2Before work begins
Fire-Resistance-Rated ConstructionBC 110.3.4Closing of fire-rated assemblies
Energy Code Compliance (TR8)BC 110.3.5 / 1 RCNY §5000-01Throughout the project (envelope, MEP, lighting)
Final (TR1)AC §28-116 / BC 110.5Project closeout, prior to sign-off or certificate of occupancy

Checklist: TR1

  1. Read the Statement of Special Inspections on the approved drawings: it sets the list.
  2. Have every special and progress inspection agency named on the TR1 before the permit.
  3. Hold the preliminary progress inspection before work begins.
  4. For anchors in concrete, masonry or stone, book the BC 1705.37 inspection with the installation.
  5. Collect each agency’s completion certification before sign-off.