Local Law 126 of 2021 requires periodic condition assessments of every parking structure by a Qualified Parking Structure Inspector (QPSI). Deadlines are set by Community District, and under Local Law 71 of 2024 the cycle shortens from six years to four starting in 2028.

Last checked: Oct 23, 2026

Key facts

  • Inspector a NYS-licensed Professional Engineer designated by DOB as a QPSI; the report goes in DOB NOW: Safety
  • Open now Sub-Cycle C — the Bronx, Queens and Staten Island — January 1, 2026 to December 31, 2027
  • From 2028 every structure assessed by January 1, 2028, then at least every four years (Local Law 71 of 2024)
  • Unsafe repaired within 90 days; amended report within two weeks of the repairs
  • In between an annual observation from the QPSI’s checklist

Does my parking garage need an inspection in New York City?

If it is a parking structure — a building or part of a building used to park or store motor vehicles, including space inside or under a building — yes. The owner must retain a New York State licensed Professional Engineer who is also a DOB-designated QPSI to inspect the structure and file a condition assessment in DOB NOW: Safety. Assessments follow a six-year cycle by Community District through December 31, 2027; Local Law 71 of 2024 then requires an assessment at least once every four years.

Key considerations

Sub-cycles by Community District

Manhattan Community Districts 1–7: January 1, 2022 – December 31, 2023. Manhattan Community Districts 8–12 and all of Brooklyn: January 1, 2024 – December 31, 2025. The Bronx, Queens and Staten Island: January 1, 2026 – December 31, 2027 — the window open now. This is the opposite of FISP, which is based on the block number.

Every four years from 2028

Local Law 71 of 2024 replaced the six-year interval: every parking structure must be assessed by January 1, 2028, and at least once every four years thereafter.

A QPSI, not any engineer

The inspector must be a New York State licensed and registered Professional Engineer whom DOB has separately designated as a Qualified Parking Structure Inspector under 1 RCNY §101-07. A structural engineer without that designation cannot file the report.

Annual observations between assessments

In the years between condition assessments, annual observations are required, based on the QPSI’s checklist from the most recent accepted report.

What is not a parking structure

Auto body and automotive repair shops, showrooms and service stations; garages with capacity for fewer than three vehicles; unenclosed, unattached outdoor lots; and garages serving one- and two-family homes.

Unsafe: the same 90-day clock as a facade

Unsafe conditions must be repaired within 90 days of filing the condition assessment, and an amended report filed within two weeks of completing the work.

SREM: monitoring with a deadline

Safe with Repairs and/or Engineering Monitoring means the structure is usable but has conditions on a clock. Under Local Law 71 of 2024, the follow-up assessment and amended report are due within two years of the initial assessment, and an SREM condition not corrected by the next cycle must be reported as Unsafe.

The one-time initial observation

Structures in Sub-Cycles B and C owed a one-time initial observation by August 1, 2024, performed by or under the direct supervision of a QPSI. If a building being taken over never completed it, that gap is already overdue.

Penalties

Local Law 70 of 2024 increased several parking-structure penalties. Confirm current amounts on DOB’s Parking Structure Fees & Penalties page before advising an owner.

Checklist: parking structure

  1. Confirm it is a parking structure and not an exception (repair shops, showrooms, garages for fewer than three vehicles, 1–2 family garages).
  2. Find the sub-cycle from the Community District.
  3. Hire a Professional Engineer who holds the QPSI designation.
  4. Keep the annual observations between assessments.
  5. Check that the one-time initial observation (due August 1, 2024 for Sub-Cycles B and C) was done.