The annual parapet observation: the NYC requirement most owners still miss
Since January 1, 2024, every building with a parapet fronting the public right-of-way — at any height — requires an annual parapet observation. It is not filed with DOB, does not require an engineer, and most owners still do not know it exists.
Last checked: Oct 23, 2026
Key facts
- Who every building with a parapet on the public right-of-way, at any height, since January 1, 2024
- Due by December 31 every year; not filed with DOB, kept for six years
- By whom any competent person — no engineer required
- If unsafe call 311 and email parapets@buildings.nyc.gov; protect at once and repair within 90 days, with no extensions
- Code AC §28-301.1.1; 1 RCNY §103-15
Who has to do an annual parapet observation in NYC?
Every owner of a building with a parapet fronting a public right-of-way, regardless of building height. Detached one- and two-family homes are exempt, as are buildings where a continuous fence or barrier stands farther from the exterior wall than half the wall’s height. The observation has been required annually since January 1, 2024 under Administrative Code §28-301.1.1 and 1 RCNY §103-15, and the report must be on file by December 31 of each year. It is not filed with DOB: the owner keeps it for at least six years and provides it on request.
Key considerations
Regardless of height
FISP begins above six stories; the parapet rule has no height threshold. A three-story walk-up with a parapet over the sidewalk requires an observation every year.
It does not require an engineer
Any person competent to inspect parapets may perform it — including a bricklayer, mason, building superintendent, architect, engineer or a New York State-authorized building inspector. That makes it inexpensive to comply with and easy to overlook.
What the observation must determine
From a close-up inspection of the entire parapet — which may be conducted from a fire escape or roof: whether the parapet is plumb within one-eighth of its cross-sectional thickness; whether there is excessive deterioration, such as displacement, cracks, missing or loose brick or coping, deteriorated mortar joints, spalling or rot; and whether appurtenances such as railings, telecom equipment, roof access rails and signs are stable.
Due by December 31, and FISP can count
The observation and report must be completed by December 31 of each year. For buildings subject to FISP, the FISP report satisfies the requirement if it contains all the information required by 1 RCNY §103-15; otherwise a separate report is needed.
If it is unsafe
The person performing the observation must notify DOB immediately by calling 311 and emailing parapets@buildings.nyc.gov; buildings subject to FISP must also file an Unsafe Notification (FISP3) in DOB NOW: Safety. The owner must immediately install public protection — a sidewalk shed, fence or netting — and correct the condition within 90 days. DOB does not grant extensions to that deadline.
The shed filing asks about it
If a shed is erected because of a parapet, the DOB NOW sidewalk shed scope of work asks whether the shed is related to the periodic parapet observation under 1 RCNY §103-15. Answer it accurately — it is how the City links the shed to the condition.
Six years of records
Owners must keep observation reports for at least six years and provide them to DOB on request. In an acquisition or refinancing, missing parapet reports are an inexpensive item that is rarely budgeted.
Checklist: the annual observation
- List every parapet that fronts a street or sidewalk, whatever the building height.
- Inspect the whole parapet close up, from the roof or a fire escape: plumb, cracks, loose brick or coping, mortar, railings and signs.
- Write the report and keep it with the building records by December 31.
- If it is unsafe: call 311, email parapets@buildings.nyc.gov, put up protection and repair within 90 days.
- Keep six years of reports.
Sources
- NYC Administrative Code, Title 28, Chapter 3: Maintenance (FISP §28-302, parapets §28-301.1.1, parking structures Article 323)
- 1 RCNY §103-15: periodic inspection of parapets
- NYC DOB Service Notice, “Annual Parapet Observation” (November 14, 2023)
- NYC DOB, Parapets
- NYC DOB, Parapets: frequently asked questions
Checked against the official text on October 23, 2026.
Related guides
- Local Law 11 explained: FISP requirements, covered buildings and the 2026 changesWhat the Facade Inspection Safety Program requires, which buildings it covers and who signs the report — including Local Law 49 of 2025, which replaces the five-year cycle with intervals of 6 to 12 years.
- Parking garage inspections in NYC: Local Law 126 and the four-year cycleA condition assessment of every parking structure by a QPSI — every six years by Community District through 2027, and every four years from 2028 under Local Law 71 of 2024. The exceptions and the 90-day clock on Unsafe.
- Sidewalk shed permits in NYC: when one is required, and the 90-day ruleA shed is required for facade work more than 40 ft above curb level and whenever a dangerous condition exists. Since February 2026, permits last 90 days, renewals require an RDP progress report, and stalled sheds carry penalties that DOB expects to start imposing in early 2027.